PROJECT METHODOLOGY

How BetterSanFernando builds project records

BetterSanFernando organizes public project records so residents can trace a published fact back to the evidence that supports it. This page explains how records are collected, connected, interpreted, and presented, and where the limits of the current dataset begin.

Published projects
324
Project evidence records
563
Evidence records with direct documents
554 of 563

These figures describe the current published project collection and may change as additional verified source evidence is added.

HOW FACTS ARE BUILT

From public source to published fact

BetterSanFernando does not treat a project page as an independent source. Published project facts remain connected to the records used to establish them.

  1. 01

    Public source

    Official page or document.

  2. 02

    Evidence record

    Source, date, identifier, and the fields the record establishes.

  3. 03

    Project link

    Evidence connected conservatively to the supported project.

  4. 04

    Published fact

    Normalized project field with provenance and source links.

Normalization changes structure, not source meaning. BetterSanFernando may standardize labels, dates, identifiers, or field placement so records can be searched consistently, but it does not turn one financial concept, documentary stage, or location into another.

EVIDENCE AND VERIFICATION

What evidence can and cannot establish

What evidence can establish

A published source can establish specific facts such as a project name, procurement reference, approved budget, winning bidder, contract amount, award date, or barangay attribution when those facts are explicitly supported by the record.

What evidence does not automatically establish

One document does not automatically establish every fact about a project. A bid result does not prove contract execution. A contract record does not prove payment or physical completion. An implementation report does not independently establish an award or contract.

What “verified” means

When BetterSanFernando describes a project fact or evidence record as verified, it means the published value is supported by the cited source and recorded provenance. It does not mean BetterSanFernando independently audited the underlying government activity, inspected the project site, or made a legal or compliance determination.

DOCUMENTARY STATUS

Documentary status, not physical progress

A project’s status summarizes the strongest documentary stage currently supported by published evidence. It should not be read as a construction-progress indicator.

  1. Planned

    Establishes: A published planning record identifies proposed work.

    Does not establish: That procurement began or the work was approved.

  2. Procurement

    Establishes: A procurement-stage record identifies a bidding process.

    Does not establish: That a bidder won or a contract was executed.

  3. Awarded

    Establishes: Award evidence identifies an award decision.

    Does not establish: An executed contract, Notice to Proceed, construction, or payment.

  4. Contracted

    Establishes: Contract evidence supports contract execution.

    Does not establish: A Notice to Proceed, physical progress, payment, or completion.

  5. Implementation Reported

    Establishes: An official implementation or utilization report describes project activity.

    Does not establish: Procurement award, signed contract, payment, disbursement, or independent physical verification.

These statuses summarize documentary support. They are not a procurement funnel, a project-completion scale, or a measure of physical work performed on site.

RECORD LINKAGE

How evidence is connected to projects

BetterSanFernando links evidence conservatively. Exact project relationships and namespaced references are stronger identity signals than similar wording.

Strong identity signals

  • Explicit evidence-to-project relationship
  • Exact canonical project relationship

Namespaced references

  • APP Code
  • BAC / control reference
  • PhilGEPS reference
  • Contract number
  • Source identifier

Not enough on their own

  • Similar project title
  • Same year
  • Same barangay
  • Similar amount

Similar names, years, barangays, or amounts may help identify a candidate match, but they are not enough by themselves to merge records.

Identifiers keep their own namespaces

BetterSanFernando project ID
Stable public route and record identity.
APP Code
Planning and procurement-plan reference.
BAC / control reference
Bids and Awards Committee process reference.
PhilGEPS reference
Philippine Government Electronic Procurement System reference.
Contract number
Contract document reference.
Source identifier
Identifier of the supporting evidence record or document.

These identifiers come from different record systems and should not be treated as interchangeable values.

READING PROJECT FIELDS

Money and geography describe different facts

Money fields are not interchangeable

Estimated budget
A planning estimate recorded in planning evidence.
Approved Budget for the Contract (ABC)
The approved procurement budget or ceiling for the contract.
Winning bid amount
The amount reported for the winning bid in procurement evidence.
Contract amount
The amount supported by published contract-related evidence.
Fund utilization amount
An amount reported in a separate utilization context.
Actual expenditure
Not established by the current published project dataset.

ABC ≠ winning bid ≠ contract amount ≠ utilization amount ≠ actual expenditure.

Barangay attribution is not an exact project location

What the map can show

Projects may be attributed to one of San Fernando’s 35 barangays when published evidence supports that relationship.

What the map cannot show

The current project dataset does not publish verified project point coordinates. Barangay attribution should not be interpreted as an exact construction site, parcel, road segment, or facility coordinate.

The Project Map therefore shows the distribution of project records by barangay. It is not an exact project-location map.

Map shading represents project-record attribution by barangay, not exact project coordinates.

MISSING INFORMATION

Missing information stays missing

  1. 01

    We do not turn missing values into zero.

    A missing contractor, amount, date, reference, or location stays missing unless a published source establishes it.

  2. 02

    We do not fill gaps from nearby records.

    Similar projects or documents do not supply a missing field for another project record.

  3. 03

    A missing record is not proof that something never happened.

    It means the current BetterSanFernando dataset has not established that fact from its published evidence.

Unknown, unavailable, and not established are not the same as zero, false, or not applicable.

COVERAGE AND LIMITS

What this dataset covers

Bounded project collection

BetterSanFernando currently publishes a bounded collection of infrastructure and public-works project records assembled from identified public sources. It is not a complete legal register of all projects, procurements, contracts, payments, or City Government activity.

Source labels

“Official source” describes the recorded source authority and provenance. It does not mean the source agency endorses BetterSanFernando.

No legal or performance findings

The presence or absence of a record is not a finding of legality, compliance, wrongdoing, project quality, project completion, or performance.

Records can change

Published records may be corrected or expanded when stronger or newer source evidence becomes available. For consequential decisions or formal citation, check the linked official document and its date.

BEFORE YOU RELY ON A RECORD

A quick verification checklist

  1. 01Open the cited official source.
  2. 02Check the document date and whether newer information exists.
  3. 03Confirm which project field the source actually establishes.
  4. 04Keep ABC, winning bid, contract amount, utilization, and expenditure separate.
  5. 05Treat missing information as unknown, not zero or proof of absence.
  6. 06Treat barangay attribution as area-level unless a verified exact location is published.

BetterSanFernando is designed to make public records easier to inspect, not to replace the official source.

KEEP EXPLORING

Explore the project data

Project Evidence

Inspect the official-source records behind published project facts.

City Projects

Browse the current published infrastructure and public-works project collection.